Wood County Hospital Environment Support Building | Bowling Green, Ohio

The 8,800 square foot powerhouse was constructed adjacent to the main hospital with 1000kW standby generation for the powerhouse and hospital back-up.

The mechanical systems include:

  • Two 200 HP “Ohio Special” natural gas boilers with #2 fuel oil back-up and provisions for two additional 200 HP boilers.
  • Three 230-ton rotary screw chillers with remote air cooled condensers and space for one additional chiller.
  • Five chilled water pumps: three chiller pumps, two variable speed primary system pumps, and one designated as a standby pump.

Alternative Energy Manufacturing Plant | Northwest Ohio

The new 250,000 square foot air conditioned manufacturing plant included 180,000 square feet of manufacturing space; 40,000 square feet of shipping and receiving; 12,000 square feet building facilities; and 18,000 square feet of quality, maintenance, and general offices.

Manufacturing utilities included 10MVA substation and power distribution; three 300 ton chillers; three 150HP air compressors; nitrogen piping system; industrial water piping; R.O water; and process water piping.

Equipment Component Manufacturing Facility | Fredericktown, Ohio

This 92,000 square foot new manufacturing facility with 25,000 square feet of office space is located in rural southern Ohio.

The facility is heated and cooled via 2 125-ton gas fired air rotation units with direct expansion cooling designed by JDRM Engineering.

Electrical design included 277/480V 3-phase 4-wire 2000AMP service; standard industrial 400-watt metal halide low bay lighting; and 277/480V 3-phase and 120/208V 3-phase bus ducts.