Rogers High School

The new 225,000 square foot high school building followed the Ohio School Facilities Commission standards. Unique features to the facility are the Planetarium and 7,800 square foot fixed seating theatrical auditorium.

The building includes faculty/administrative offices; student classrooms; science, career tech, and computer labs; media center; student dining; large dining area and culinary arts kitchen; two gymnasiums; wrestling room; and weight rooms.

Mechanical systems design encompasses complete HVAC and plumbing systems.  The HVAC system consist of 13 variable air volume air handlers with variable speed drives utilizing heat recovery wheels supplying 271,000 CFM to fan powered variable volume terminal units within the space.  Heating and cooling is accomplished with two 7,000 MBH flex-tube boilers and two 350-ton air cooled chillers.  Piping systems are of the primary secondary arrangement.

Electrical design included electrical service connection; back-up power generation; computer controlled exterior and interior lighting; special theatrical lighting and control; and industrial power distribution and equipment wiring in the career tech lab.

‹ Back to Case Studies