The Armes Family Cancer Center

Findlay, Ohio

Electrical

Design for the Electrical systems includes a new generator, fire pump, nurse call, fire alarm, interior and exterior lighting, electrical distribution, security, and structured cabling data.

Mechanical

Mechanical systems include HVAC, plumbing/piping, medical gas and fire protection (completely sprinkled). A remote chiller was installed on the northwest side of the building

Project Details

The modification and 15,000 square foot addition to this existing Cancer Treatment Center was performed while the facility remained fully functional. The addition consisted 17 new exam rooms, 20 new infusion bays, 3 new Consult rooms, and a feature conference room. Radiology rooms and a linear accelerator were installed as part of a previous renovation. The Mechanical, Electrical, Plumbing, and Technology construction costs were estimated at $1,300,000 and these disciplines were built within this budget.
Project Size
15,000 sq ft
Services
Mechanical, Electrical